Hi all ,
1: If I want to store intermediate data , which stage I should use , data set , file set or sequencial file set in parallel jobs ?
2: How to migrate jobs from vrsion 6 to 7.5 and change them from parallel to server ?
Thanks in advance ,
kw
Migrating DS 6 to 7.5
Moderators: chulett, rschirm, roy
You are:
1. Posting in the wrong forum
2. Hijacking someone elses message
3. Not giving enough information. How much data, for what purpose do you wish to stage. Upgrade from 6 to 7.5 is a non-issue. Change them from parallel to server, why? Is your licensing different and doesn't include parallel? If so, the answer is re-write from scratch.
1. Posting in the wrong forum
2. Hijacking someone elses message
3. Not giving enough information. How much data, for what purpose do you wish to stage. Upgrade from 6 to 7.5 is a non-issue. Change them from parallel to server, why? Is your licensing different and doesn't include parallel? If so, the answer is re-write from scratch.
Kenneth Bland
Rank: Sempai
Belt: First degree black
Fight name: Captain Hook
Signature knockout: right upper cut followed by left hook
Signature submission: Crucifix combined with leg triangle
Rank: Sempai
Belt: First degree black
Fight name: Captain Hook
Signature knockout: right upper cut followed by left hook
Signature submission: Crucifix combined with leg triangle