Hi All,
How to control the execution order of different stages in a single job.
Thanks in advance.
Execution Order
Moderators: chulett, rschirm, roy
-
- Premium Member
- Posts: 497
- Joined: Sun Dec 17, 2006 11:52 pm
- Location: Kolkata
- Contact:
You can only control the order by the way you design the job as DataStage will try to execute everything concurrently. If stages have dependancies then those will determine the execution order, i.e. if you create a dataset and use that as a lookup then that branch will have to complete before the first data row is processed in the lookup.
<a href=http://www.worldcommunitygrid.org/team/ ... TZ9H4CGVP1 target="WCGWin">
</a>
</a>
-
- Premium Member
- Posts: 497
- Joined: Sun Dec 17, 2006 11:52 pm
- Location: Kolkata
- Contact:
Thanks for the reply, its not like that all the stages are trigerred at the same time, Dataset creation and the same time it is being used in the lookup leading to the failure of the look up.ArndW wrote:You can only control the order by the way you design the job as DataStage will try to execute everything concurrently. If stages have dependancies then those will determine the execution order, i.e. if you create a dataset and use that as a lookup then that branch will have to complete before the first data row is processed in the lookup.
-
- Premium Member
- Posts: 497
- Joined: Sun Dec 17, 2006 11:52 pm
- Location: Kolkata
- Contact:
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
-
- Premium Member
- Posts: 497
- Joined: Sun Dec 17, 2006 11:52 pm
- Location: Kolkata
- Contact: