Hello
Does anyone know how to set a dynamic range for the unstructured stage.
I can pass the range as a parameter into the Range Expression but it doesnt update the Template Data Range. This means every time the Excel sheet changes I lose some data.
Has anyone found a workaround for this ?
Thanks
Unstructured stage - dynamic ranges
Moderators: chulett, rschirm, roy
Unstructured stage - dynamic ranges
Colin Larcombe
-------------------
Certified IBM Infosphere Datastage Developer
-------------------
Certified IBM Infosphere Datastage Developer
-
- Participant
- Posts: 54607
- Joined: Wed Oct 23, 2002 10:52 pm
- Location: Sydney, Australia
- Contact:
Re: Unstructured stage - dynamic ranges
I don't know how to do this. Perhaps you could raise a PMR with IBM Support, who can escalate to Engineering if necessary.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.