Unstructured stage - dynamic ranges

Post questions here relative to DataStage Enterprise/PX Edition for such areas as Parallel job design, Parallel datasets, BuildOps, Wrappers, etc.

Moderators: chulett, rschirm, roy

Post Reply
clarcombe
Premium Member
Premium Member
Posts: 515
Joined: Wed Jun 08, 2005 9:54 am
Location: Europe

Unstructured stage - dynamic ranges

Post by clarcombe »

Hello

Does anyone know how to set a dynamic range for the unstructured stage.

I can pass the range as a parameter into the Range Expression but it doesnt update the Template Data Range. This means every time the Excel sheet changes I lose some data.

Has anyone found a workaround for this ?

Thanks
WhatsApp Image 2023-03-02 at 16.26.06.jpeg
WhatsApp Image 2023-03-02 at 16.26.06.jpeg (20.63 KiB) Viewed 15368 times
Colin Larcombe
-------------------

Certified IBM Infosphere Datastage Developer
ray.wurlod
Participant
Posts: 54607
Joined: Wed Oct 23, 2002 10:52 pm
Location: Sydney, Australia
Contact:

Re: Unstructured stage - dynamic ranges

Post by ray.wurlod »

I don't know how to do this. Perhaps you could raise a PMR with IBM Support, who can escalate to Engineering if necessary.
IBM Software Services Group
Any contribution to this forum is my own opinion and does not necessarily reflect any position that IBM may hold.
Post Reply