Clear a multiple input hash file
Posted: Mon Nov 06, 2017 5:51 am
I have a job having the below sequence of stages.
DB2 Connector Stage -> Transformer (10 output links basis various constraints) -> Hash File -> Sequential File
As I see, there is "Clear File before writing" property set for only 3 of the input links. Till now, the job is running as is.
But, we are migrating all our jobs from DS 7.5 to 11.3. When working on data validation, post migration, we are seeing issues in the output sequential file generated. For multiple runs of the same job with same input parameters, 10 outputs of transformer is same, but, the sequential file output is different every time.
Does it do anything with the Clear Hash file property to be set for other 7 input links?
Please help me.
DB2 Connector Stage -> Transformer (10 output links basis various constraints) -> Hash File -> Sequential File
As I see, there is "Clear File before writing" property set for only 3 of the input links. Till now, the job is running as is.
But, we are migrating all our jobs from DS 7.5 to 11.3. When working on data validation, post migration, we are seeing issues in the output sequential file generated. For multiple runs of the same job with same input parameters, 10 outputs of transformer is same, but, the sequential file output is different every time.
Does it do anything with the Clear Hash file property to be set for other 7 input links?
Please help me.