We need to migrate job controle from version 7.1 to version 8. When I run the job in V8 it finishes but as if no job were attached to it. This job controle was designed in version 7.1 and run ok so far in this version.
Does anyone get this situation ?
Can I fix it or should I replace it by a job sequenceur ?
By "Job Control" do you mean you have a server job and call up the functions in the "Job Control" section? If so, did you really perform correct error checking in that hand-written code? Do you have a sample or sample output?
It would seem that there is some problem with the way the Job Control code is designed. Luckily, you can add calls to DSLogInfo() or DSLogWarn() through the code to see what is happening and to debug it. The first thing would be to put a call to DSLogInfo() right before and right after the call to DSExecute and display all parameter values.