Search found 15 matches
- Thu Jul 24, 2014 7:57 am
- Forum: General
- Topic: Named License for DS/QS Designer
- Replies: 4
- Views: 2457
Named License for DS/QS Designer
We are in the process of reviewing our client license policy for DS/QS designer clients. We currently have concurrent licenses housed on the server. We have multiple BUs who use the system and hence chargeback becomes a tricky point. Does IIS 9.1.2 support named licenses for DS/ QS designer clients....
- Thu Jul 24, 2014 7:52 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Balanced Optimizer - Architecture Query
- Replies: 7
- Views: 4286
- Wed Jul 02, 2014 11:51 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Balanced Optimizer - Architecture Query
- Replies: 7
- Views: 4286
- Wed Jul 02, 2014 10:02 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Balanced Optimizer - Architecture Query
- Replies: 7
- Views: 4286
Re: Balanced Optimizer - Architecture Query
Thanks for the response. That was our initial thought as well, but when we reached out to the vendor to confirm the same, prior to purchasing the license, here is the response we got. Am I missing something here. Would I really need to have it on my Non-dev envts? "the generation of the Optimiz...
- Wed Jul 02, 2014 8:33 am
- Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
- Topic: Balanced Optimizer - Architecture Query
- Replies: 7
- Views: 4286
Balanced Optimizer - Architecture Query
We have decided to invest in the Balanced Optimizer for Datastage to help us pushdown DB level functions and utilize the underlying DBs like neteeza properly. In theory, we understand the following flow in using BO. 1. Design DS job in designer. 2. Open BO window from designer and generate the optim...
- Fri Nov 05, 2010 1:18 pm
- Forum: IBM QualityStage
- Topic: Unexpected output from MATCH Stage
- Replies: 4
- Views: 2797
Julio, These cutoffs were defined based on the weights given for every criteria. I am not sure why when records aren't coming out as MATCH when the consolidated weight is greater than the cutoff. Is there anyway to turn on some kind of tracing on to determine the issue. I have about 40 other matches...
- Thu Oct 21, 2010 12:48 pm
- Forum: IBM<sup>®</sup> SOA Editions (Formerly RTI Services)
- Topic: Multiple Instance of JOb starting...
- Replies: 1
- Views: 3254
Multiple Instance of JOb starting...
Ernie, Here is the scenario that I am facing... I have 2 jobs JOB1 and JOB2, which have to be published as services S1 and S2 (using ISD). Service S1 (using JOB1) comes up as expected with only one instance of JOB1 active all the time. Service S2 (Using JOB2) comes up by bringing up an instance of J...
- Wed Sep 08, 2010 5:06 pm
- Forum: IBM QualityStage
- Topic: Unexpected output from MATCH Stage
- Replies: 4
- Views: 2797
Unexpected output from MATCH Stage
I have a match stage where i block on VariableA and match based on VarB, VarC and VarD. I give a Agreement weight of 50 for each of the matches (b,c &D). The cut off for match is 149 / clerical 149 / Dups 150. I had my test data manufactured to pass this match and it came out as residual. When i...
- Thu Aug 26, 2010 10:02 am
- Forum: IBM<sup>®</sup> SOA Editions (Formerly RTI Services)
- Topic: Creating Webservice (WISD Job) with Array Input
- Replies: 1
- Views: 3469
Creating Webservice (WISD Job) with Array Input
I am creating a job which accepts multiple rows (variable --> candidate inforamtion for MATCH) and the output is expected to be the list of candidates which cross a certain MATCH cutoff (hence output is also going to be variable number of rows). I am trying to understand how this job can be publishe...
- Mon Oct 26, 2009 9:19 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Error while working with web service pack
- Replies: 2
- Views: 2138
- Thu Oct 15, 2009 6:28 am
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Designing DataStage jobs as services
- Replies: 4
- Views: 6318
Ernie, I have a QS Job that is opened up as a service using the mngr.cfg file. It is being used real time. The Java program calls the QS job as and when its needed. In short, we use QSRT and the jobs that have to be opened up as services and the ports where they have to be opened are specified in th...
- Wed Oct 14, 2009 12:55 pm
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Designing DataStage jobs as services
- Replies: 4
- Views: 6318
Question regarding QS Migration
Hi, I came across your earlier posts regarding publishing job as a service and wanted to clarify my doubts with you. Currently I have a QS job and it is being used in a Java application. I bring up my program in Qualitystage using the following command: nohup qsrtmngr -c /opt/qsadm/Ascential/Quality...
- Mon Mar 21, 2005 3:43 pm
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Assign SYSDATE to Job Parameter
- Replies: 8
- Views: 5416
Got another solution...
This is what i did... I had a job called "datetest", in which i used a parameter called "todayparam". I opened another job and in the job control, i added "datetest", and the line which says ErrCode = DSSetParam(hJob1, "todayparam", 2005-03-21) i replaced the ...
- Mon Mar 21, 2005 3:05 pm
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Assign SYSDATE to Job Parameter
- Replies: 8
- Views: 5416
To Craig ...
STARTDATE TRUNC(SYSDATE-1) ENDDATE TRUNC(SYSDATE) does not work.. It gives out an error at the parameter declaration stage itself. I am using the same job parameters in many places in a number of jobs, so its highly important to automate it. To reiterate : the requirement is , having a job parameter...
- Mon Mar 21, 2005 1:57 pm
- Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
- Topic: Assign SYSDATE to Job Parameter
- Replies: 8
- Views: 5416
Assign SYSDATE to Job Parameter
Hi , I have to run an incremental load every day for the transactions for the previous day. STARTDATE and ENDDATE are two parameters, and basically, STARTDATE should be SYSDATE -1 and ENDDATE should be SYSDATE. Right now, everyday the two values are being fed in manually. How can i automate this pro...