Search found 4 matches
- Tue Oct 16, 2018 1:44 am
- Forum: General
- Topic: Scheduling a job with an override
- Replies: 2
- Views: 2458
Scheduling a job with an override
Hi everyone , i have one scenario i want to schedule a parallel or sequencer which needs to run daily through director (not using any scheduler tool )at 12.01am only once if someone wants to trigger a job in between then its not suppose to run and need to trigger email notification .its a" high...
- Tue Jun 13, 2017 1:10 am
- Forum: General
- Topic: Running jobs in parallel
- Replies: 11
- Views: 7030
- Tue Jun 13, 2017 12:50 am
- Forum: General
- Topic: Running jobs in parallel
- Replies: 11
- Views: 7030
datastage 11.5
UCDI,
"apology for late reply"
Tried with no links in sequencer but when i ran jobs all wont run at time 1 runs remaining 9 are goes in queue.tried this solution.
thanks in advance
"apology for late reply"
Tried with no links in sequencer but when i ran jobs all wont run at time 1 runs remaining 9 are goes in queue.tried this solution.
thanks in advance
- Fri Jun 09, 2017 12:09 am
- Forum: General
- Topic: Running jobs in parallel
- Replies: 11
- Views: 7030
Running jobs in parallel
Interesting question. i have 10 separate parallel jobs and when i run those jobs from sequencer or anything. i want all jobs to be run @ same time .not sequencially one after another.can anyone help me to find out this solution :D i dont want include all 10 parallel jobs in one job all jobs are sepa...