Search found 12 matches

by dwuser
Tue Jul 03, 2007 11:21 am
Forum: IBM<sup>®</sup> SOA Editions (Formerly RTI Services)
Topic: Error while logging in Administrator
Replies: 1
Views: 2738

Error while logging in Administrator

Hi, We have completed the installation and configuration of DS8 as per the installation document. But we face an issue while logging in the Administrator/Designer/Director. Users have been created in the web console. Please find below the error we receive. Failed to authenticate the current user aga...
by dwuser
Thu Jun 28, 2007 9:49 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: IBM Information Server Installation
Replies: 5
Views: 2877

A workaround was provided by the IBM folks to resolve this issue. The issue was because of JAVA 1.5 which was installed as default in our Solaris 10 box. The install package will install a default JAVA JVM "1.4.2_10" so we repointed the PATH to this java version. Instead of the default &qu...
by dwuser
Tue Jun 26, 2007 12:34 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: IBM Information Server Installation
Replies: 5
Views: 2877

I am not sure which parameter i need to set on OS (kernel) level to increase the memory limit. Is there any option with 'install' script to specify the memory limit (for java). In solaris 10 i heard that there is no longer system-wide limit for process and all are dynamic, in the IBM installation pr...
by dwuser
Tue Jun 26, 2007 2:16 am
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: IBM Information Server Installation
Replies: 5
Views: 2877

IBM Information Server Installation

We are having challenges when installing IBM information server (DataStage 8.0.1) in Solaris (sparc) system. It is throwing the following error as-soon-as we run the install command (given from root login), please find the error below. All the necessary information like UNIX configuration, kernel pa...
by dwuser
Thu Jun 14, 2007 5:39 pm
Forum: IBM<sup>®</sup> DataStage Enterprise Edition (Formerly Parallel Extender/PX)
Topic: (Server=Dedicated) parameter in TNSNAMES.ORA file
Replies: 4
Views: 6218

(Server=Dedicated) parameter in TNSNAMES.ORA file

Hi All, We have a condition here in Data Stage 7.5.2 with server jobs. Currently, we are using 9.2.0.8 oracle database had a performance issue. One of the suggestions from IBM was to set the (Server=Dedicated) parameter in the TNSNAMES.ORA in the data stage server. After setting up the parameter as ...
by dwuser
Wed Jun 13, 2007 1:05 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: hash file
Replies: 3
Views: 1844

Im with the same project.. The oracle version we are using here is 9.2.0.7
This problem occurs even when I view data in Hash stage.

The datastage version 7.5.2
by dwuser
Mon May 14, 2007 6:08 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: How to add New NLS Map in the Datastage Server?
Replies: 2
Views: 2748

How to add New NLS Map in the Datastage Server?

Hi, Our Target database is in UTF-16 format. When writing to a database, we like to convert data to UTF-16 format. But in the Available/ show all Maps list there was no UTF-16 format. Is there a way to add UTF-16 code sheet to the server and make available in the list? Any inputs or document on this...
by dwuser
Sat Apr 21, 2007 11:15 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Sequencer Aborts Due to Error Code = -14
Replies: 23
Views: 13899

Ray,

Yes we are using huge select queries in the source stage of the jobs.
Will that cause the timeout problem. (code=-14)
by dwuser
Fri Apr 20, 2007 9:18 am
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: Sequencer Aborts Due to Error Code = -14
Replies: 23
Views: 13899

We got the same error message and many sequencers are failing daily... We did the following to get some fruitfull results.. 1. Installed the patch provided by IBM to increase the timeout to 600. after impleenting this patch the sequencer waited for the whole timeout period and aborted, but it consid...
by dwuser
Sat Apr 14, 2007 12:29 am
Forum: General
Topic: Handling special characters with Oracle OCI
Replies: 6
Views: 9083

Chulett,

Can you please provide the link for this topic.
by dwuser
Fri Apr 13, 2007 8:20 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: ORAOCI 9i stage - problem with decimal column
Replies: 4
Views: 2084

No, we haven't changed any settings in the job. But we have changed the T30FILE value from 200 to 500 To give a backgroud on this issue: We have recently upgraded from 7.0 to 7.5.2. We had some problem with T30FILE size so we changed it from 200 to 300. The three column are loaded by the following S...
by dwuser
Fri Apr 13, 2007 7:08 pm
Forum: IBM<sup>®</sup> Infosphere DataStage Server Edition
Topic: ORAOCI 9i stage - problem with decimal column
Replies: 4
Views: 2084

ORAOCI 9i stage - problem with decimal column

We are extracting the source data from Oracle 9i database using ORAOCI91i stage . The stage has two decimal columns and a date column. But sometimes the decimal column have some text appended to it. this is not occuring everytime we trigger the job. Like : 999999999 ojects/edw_prod_7 instead of 9999...